| Deck Condition | Poor - Advanced section loss, deterioration, spalling or scour. |
| Superstructure Condition | Poor - Advanced section loss, deterioration, spalling or scour. |
| Substructure Condition | Poor - Advanced section loss, deterioration, spalling or scour. |
| Culvert Condition | Not Applicable - Structure is not a culvert. |
| Channel Condition | Good - Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. |
| Railings | Inspected feature does not meet currently acceptable standards or a safety feature is required and none is provided. |
| Transitions | Inspected feature does not meet currently acceptable standards or a safety feature is required and none is provided. |
| Approach Guardrail | Inspected feature meets currently acceptable standards. |
| Approach Guardrail Ends | Inspected feature meets currently acceptable standards. |
| Deck Geometry Evaluation | Somewhat better than minimum adequacy to tolerate being left in place as is |
| Underclearance Evaluation | Not applicable |
| Approach Roadway Alignment | Equal to present desirable criteria |
| Scour Critical Bridges | Bridge is scour critical; bridge foundations determined to be unstable for calculated scour conditions: - Scour within limits of footing or piles - Scour below spread-footing base or pile tips. |