Skip to main content

Truck Trail 17
Bridge Condition Details

Share:   Twitter Logo Facebook Logo 
Structure Number: 013846
Bridge: Truck Trail 17
Over: Roans Creek
State: Alabama
County:Baldwin County
Year Built:1929
Bridge Condition: Poor


Deck ConditionSerious - Loss of section, deterioration, spalling or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
Superstructure ConditionSerious - Loss of section, deterioration, spalling or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
Substructure ConditionSerious - Loss of section, deterioration, spalling or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
Culvert ConditionNot Applicable - Structure is not a culvert.
Channel ConditionSatisfactory - Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly.
RailingsInspected feature does not meet currently acceptable standards or a safety feature is required and none is provided.
TransitionsInspected feature does not meet currently acceptable standards or a safety feature is required and none is provided.
Approach GuardrailInspected feature does not meet currently acceptable standards or a safety feature is required and none is provided.
Approach Guardrail EndsInspected feature does not meet currently acceptable standards or a safety feature is required and none is provided.
Deck Geometry EvaluationMeets minimum tolerable limits to be left in place as is
Underclearance EvaluationNot applicable
Approach Roadway AlignmentEqual to present minimum criteria
Scour Critical BridgesBridge foundations determined to be stable for assessed or calculated scour conditions; calculated scour is above top of footing.



Bridge Imp. Cost:$415,000
Road Imp. Cost:$42,000
Cost Estimate Year:2019
Work Proposed:Replacement of bridge or other structure because of substandard load carrying capacity or substandard bridge roadway geometry.
Work to be Done By:Work to be done by contract



Concerned about the condition of a bridge in your area? See recommended options below to contact your elected officials:

Option 1 - State
Contact your State Representative:
AL Representatives (State)
Contact your State Senators:
AL Senators (State)

State House - not currently applicable in Alabama
State Senate - not currently applicable in Alabama
Option 2 - Federal
Contact your Representative in the US Congress:
AL Representatives (Congress)
US House - Not currently applicable in Alabama
Option 3 - Federal
Contact your Senators in the US Congress:
AL Senators (Congress)
US Senate - Not currently applicable in Alabama